Operating instructions
32
7.1 General
• Use piping materials and joining methods acceptable 
to authority having jurisdiction. In absence of such 
requirements:
• USA - National Fuel Gas Code, ANSI Z223.1/NFPA 
54
• Canada - Natural Gas and Propane Installation Code, 
CAN/CSA B149.1
• Size and install gas piping system to provide sufcient 
gas supply to meet maximum input at not less than 
minimum supply pressure. See Table 10.
• Support piping with hooks straps, bands, brackets, 
hangers, or building structure components to prevent or 
dampen excessive vibrations and prevent strain on gas 
connection. Boiler will not support piping weight.
• Use thread (joint) compound (pipe dope) suitable for 
liqueed petroleum gas.
• Provide sediment trap up stream of gas valve.
• Install manual main shutoff valve outside of jacket. See 
gure 7-2.
7.2 Conversion Kit Instructions
• See Gas Conversion Kit Instructions included with Boiler.
Table 10 - Gas Supply Pressure 
CAUTION
WHAT TO DO IF YOU SMELL GAS
• Do not try to light any appliance.
• Do not touch any electrical switch; do not use 
any phone in your building.
• Immediately call your gas supplier from a 
neighbor’s phone. Follow gas supplier’s 
instructions. 
• If you cannot reach your gas supplier, call the re 
department.
! 
Gas Supply Pressure
MODEL
Natural Gas Propane
Min. Max. Min. Max.
050
3.0" w.c. (0.7 
kPa)
13.5" w.c. 
(3.3 kPa)
5.0" w.c. (1.2 
kPa)
13.5" w.c. (3.4 
kPa)
075
100
150
200
299
FIGURE 7-1 Gas Connection
Note: See Glossary - Piping Table 16  
NOTICE
Use two (2) wrenches when tightening and tting 
to pipe boiler's threaded ttings. Boiler's internal 
piping can be damaged if subjected to excessive 
torque.
Gas Connection
7 - GAS SUPPLY PIPING










