Operating instructions
25
1"(2.54cm) 
Maximum
Combustion 
Air
Vent
FIGURE 6-4 Side Wall Concentric Terminal FIGURE 6-5 Side Wall Concentric Terminal Multiple 
Appliances
1" (25.4mm) 
Maximum
Maintain 12"
 clearance above 
highest anticipated 
snow level or grade
* See Note 
Below
Vent
Combustion
 Air
1" (25mm) 
Maximum
Roof 
Overhang
36"(0.9m(457mm) 
(28m)) Minimum
Maintain 12"(30cm) US 
(18"(46cm) Canada) 
Clearance Above 
Highest Anticipated 
Snow Level Or Grade
12" (305mm) Minimum
*Must be less than 4" (102mm) or greater than 24" 
(610mm) Horizontal distance between end bells of each air 
intake to prevent ue gas recirculation.
FIGURE 6-6 Concentric Terminal Connection 
Note: Securing strap must 
be eld installed to prevent 
movement of termination 
kit in side wall
Vent
Combustion Air
1"(25.4mm) 
Maximum 
**See 
Note
*2 or 3" (51 or 77 mm) Diameter 
PVC intake/combustion air
Combustion Air
*2" (
51mm) 
Diameter = 41" Length (1.1m)
 3" (77mm) Diameter = 47" Length (1.2m)
** Note Overall length may be modied by cutting or extending 
both combustion air and vent pipes. 12" (305mm) is minimum 
allowable length and 60" (1.2m) is maximum allowable length for 
this dimension. 
 SDR-26 PVC (D2241) only may be used for extending pipes. 
Do not use Schedule 40 PVC or use couplings to extend pipes. 
Dimension will change if intake/vent pipes are lengthened or 
shortened.
OD 3½" (
89mm)
 - *2" (
51mm) 
kit
OD 4½" (114mm) - 3" (77mm)
kit
* Note: 2" (51mm) For use with models 050/075/100. 
 3" (77mm) For use with models 075/100/150/200/299
 4" (101mm) For use with model 299 
6 - COMBUSTION AIR AND VENT PIPING










