Operating instructions
17
Heating Load Heating Load
Heating Load
CH/System 
Pump
12"(305mm) Maximum 
separation
12"(305mm) 
Maximum 
separation
Existing closely spaced tees 
in primary system loop
Heating Load Heating Load
Heating Load
FIGURE 5-7A Single Boiler Using Primary/Secondary Pumping With Closed External Primary Loop
Heating system 
with existing 
primary loop. 
Internal primary 
loop ball valves 
closed
FIGURE 5-7B Single Boiler Using Primary/Secondary Pumping With Open External Primary Loop
CH/System 
Pump
12"(305mm) Maximum 
separation
Existing closely spaced tees 
in primary system loop
Limit length
 to 
5' (1.6m)
12"(305mm) 
Maximum 
separation
Limit length
 to 
5' (1.6m)
Internal primary loop 
ball valves open. 
Heating system 
without existing 
primary loop. 
5 - HYDRONIC PIPING
3/8"/10mm Open 
End Wrench may 
be required to turn 
valve
3/8"/10mm Open 
End Wrench may 
be required to 
turn valve










