Operating instructions
26
 End Of Normal Sequence Of Operation
Thermostat ends call for heat.
Gas valve and circulator pump are 
de-energized, valve and fl ame lights go out.
Blower runs for 30 seconds post purge,  
purge light is on.
Blower is de-energized after 30 seconds, 
purge light shuts off.
Boiler stand by for next call for heat.
11 - DETAILED SEQUENCE OF OPERATION










