Operating instructions

15
Check Gas Supply
Gas pipe to boiler must be correct size for length of
run and total Btuh input of all gas utilization equipment
connected to it.
See Tables 6 and 7
for proper size.
Verify your gas line complies with local codes and gas
company requirements.
Connecting Gas Piping
Table 5 - Gas Supply Pressure
Pressure Natural Gas Propane Gas
Minimum 4” w.c. 10” w.c.
Maximum 10” w.c. 14” w.c.
Please check line pressure while unit is running.
Table 6 - Natural Gas Piping Sizes
Pipe Length
Pipe Capacity - BTU/Hr. Input
(1)
½” ¾” 1” 1¼”
20’ 92,000 190,000 350,000 625,000
40’ 63,000 130,000 245,000 445,000
60’ 50,000 105,000 195,000 365,000
Table 7 - Propane Gas Piping Sizes
Pipe
Length
Pipe Capacity - BTU/Hr. Input
(1)
Copper Tubing
(2)
Iron Pipe
”¾½¾
20’ 131,000 216,000 189,000 393,000
40’ 90,000 145,000 129,000 267,000
60’ 72,000 121,000 103,000 217,000
(1)
Includes Fittings
(2)
Outside Diameter
Refer to
Figure 14
for general layout at boiler. Gas line
enters boiler through left side panel.
Boiler is equipped with ½” NPT connection on gas valve for
supply piping and ½” NPT ball valve for manual shut off.
Following rules apply:
1.
Use only those piping materials and joining methods
listed as acceptable by the authority having jurisdiction,
or in the absence of such requirements,
• United States - National Fuel Gas Code, ANSI
Z223.1/NFPA 54.
• Canada - Natural Gas and Propane Installation Code,
CAN/CSA B149.1.
2.
Use pipe joint compound suitable for lique ed
petroleum gas on male threads only.
3.
Use ground joint unions.
4.
Install sediment trap upstream of gas controls.
5.
Use two pipe wrenches when making connection to
gas valve to keep it from turning.
6.
Install manual main shutoff valve in vertical pipe
about 5 feet (1.5m) above oor outside boiler
jacket.
7.
Tighten all joints securely.
8.
Propane gas connections made by licensed propane
installer.
9.
Two stage regulation used by licensed propane
installer.
10.
Propane installer to verify Propane gas piping.
11.
Recommend use ½” union suitable for natural and
propane gas after ball valve to facilitate service on
unit.
Leak Check Gas Piping
Pressure test boiler and gas connection before placing
boiler in operation.
Pressure test over 1/2 psig (3.5 kPa). Disconnect boiler
and its individual gas shutoff valve from gas supply
system.
Pressure test at 1/2 psig (3.5 kPa) or less. Isolate boiler
from gas supply system by closing manual gas shutoff
valve.
Locate leakage using gas detector, noncorrosive
detection uid, or other leak detection method
acceptable to authority having jurisdiction. Do not
use matches, candles, open ames, or other methods
providing ignition source.
Correct leaks immediately and retest.
7 - GAS SUPPLY PIPING
Figure 14 - Gas Piping
Length of pipe or tubing should be measured from gas
meter or propane second stage regulator.