Setup guide

MMAC-M5FNB SETUP
Page 3-9
Figure 3-5. Installing the Power Supply Module(s)
5. Tighten the knurled knobs to secure the M5PSM to the
MMAC-M5FNB.
6. If you are installing an additional M5PSM, repeat steps 3 - 5.
After you have finished installing the power supply module(s), the
MMAC-M5FNB is ready to be powered up; however, we recommend
that you first install the repeater/management module and the MIM
or MIMs, as well as the security bars (if desired). Refer to the
applicable module manuals for more information about MIM
installation; see below for security bar installation and power-up
instructions.
3.2.5 Installing the Security Bars
The MMAC-M5FNB is equipped with security bars to prevent
unauthorized access to the hub and its installed modules. Two security
bars have been provided: one to cover the top row of knurled knobs
securing the modules to the chassis, and one to cover the bottom row
of knobs.
MMAC-M5FNB
The Complete Networking Solution™
Multi Media Access Center
M5PSM
Mandatory
power supply
Optional
redundant/load
sharing power supply
100-125V ~ 5A
220-250V ~ 3A
50/60Hz
M5PSM
100-125V ~ 5A
220-250V ~ 3A
50/60Hz
POWER
OK FAIL
FAULT
+5 VOLT TEST
-5 VOLT TEST
+12 VOLT TEST
-9 VOLT TEST
COMMON
POWER FAIL
SN
POWER
OK FAIL
FAULT
+5 VOLT TEST
-5 VOLT TEST
+12 VOLT TEST
-9 VOLT TEST
COMMON
POWER FAIL
SN