User`s guide
Installing the 9C306 System Monitor
2-2
If the SmartSwitch 9000-6 Slot chassis has not been powered up, make sure that all
modules have been properly installed; then power up the SmartSwitch 9000-6 Slot
chassis by following the steps in the
SmartSwitch 9000-6 Slot 9C106 Chassis Setup
and Installation Guide.
Figure 2-1. Installing the System Monitor
STATUS
C
O
M
1
C
O
M
2
EPIM
LNK
EPIM-T
SM
9C306
FAN
9C406
POWER REDUNDANCY POWER REDUNDANCY
ESD WRIST STRAP
GROUNDING
RECEPTACLE
LOAD
100%
50%
0%
OL
LOAD
100%
50%
0%
OL
9C406
9C406
100-125 ~ 4.0A
200-250V ~ 2.0A
50/60 Hz
100-125 ~ 4.0A
200-250V ~ 2.0A
50/60 Hz
SN
SN
SN
PS-2
PS-1
9C406