User`s guide
Quick VLAN Walkthrough
Port Based VLAN User’s Guide 4-21
14. Use the arrow keys to highlight the SAVE command at the bottom of
the screen. Press ENTER. Port 10 is now acting as a 1Q Trunk port and
every VLAN is in its Egress List. All frame formats for this new 1Q
Trunk port are set to tagged. The screen should now look like
Figure 4-8.
Figure 4-8 Walkthrough Stage Three
Now that The TEST VLAN and the 1Q Trunk connection are set up, we
can proceed to activate the TEST VLAN.
15. On the VLAN Main Menu screen, use the arrow keys to highlight the
DEVICE/VLAN CONFIGURATION menu item. Press ENTER.
The Device/VLAN Configuration screen, shown in Figure 4-9,
displays.