Operating instructions
K6
Fig. 16
Post Commissioning
l
Ensure system pressure has been set correctly.
l
Set DHW temperature adjustment knob to required position
l
Set heating flow temperature adjustment knob to required
temperature.
l
Set the built in clock or external programmer to
householder’s requirements.
l
Set external controls.
l
Switch boiler to domestic hot water position and draw off hot
water to allow TSS@ cylinder to heat up quickly.
Handing Over to the Householder
l
Demonstrate the lighting and operation of the boiler.
l
Demonstrate how to maintain the system pressure.
l
Demonstrate the operation and settin
8
of the built-in clock.
l
Explain that the reheating of the TSS cylinder may bring
the boiler on unexpectedly except in heating only position.
l
Explain the need for annual servicing and that it must be
carried out by a competent person.
l
Fill out and register guarantee.
l
Leave users instructions, installation manual and all other
documentation with the householder.