Operating instructions

Safetv Valves
Drill and plug the wall and secure the hanging bracket using
the screws provided (refer to the paper template drawings).
Remove the boiler from its packaging as shown in (fig. 8) and
remove the outer case as shown in (fig. 9).
Please note: If the pre-piping jig has been used it must be
removed before attempting to hang the boiler.
Place the boiler on the wall on the hanging bracket.
Connecting the boiler to the system
- Push in the tabs P (fig 10) on either side of the boiler and
pivot the electrical box forward to gain access to the valve
connections.
- Remove the yellow caps and connect the boiler to the taps
using washers provided in the plastic bag.
3 x fibre washers for the C/H flow and return and hot water
outlet connections
1 x fibre washer and mesh filter “F” for the cold water inlet.
1 x rubber washer “R” for gas connection.
Using (fig. 10) for reference, connect the gas and water pipes
to the valves located at the base of the appliance using the
tails provided. There is a 190 mm space between the valves
and the wall to make these connections.
Provision must be made to fill and recharge the system
pressure. This can be achieved using a filling loop or other
methods approved by the local water authority.
There are two pressure relief valves fitted to the CALYDRA.
The DHW pressure relief valve connecting pipe is supplied
attached to.the valve and the CH pressure relief valve tube is
clear silicone and is packed with the boiler. They should
terminate together below the boiler over a tundish or a 28 mm
to 22 mm reducer (see P 17, fig 10) which should in turn
discharge safely outside the premises. Care should be taken
f
Fig. 8
Fig. 9
q
.
chffoteaux~
,-AA