User Manual

RS02109/0814/CD 26 www.cdtechno.com
Figure A9
Module Stacking/System Assembl y
Wi t h base prop erly installed, modules
unpackaged and in the horizontal position,
locate the C&D issued system diagram to
verify proper cell orientation wh en stacking
modules.
C&D recommends the following two methods for
handlin g Liberty 2V modules.
1. Portable Crane/Fork lift:
In the case of limited access in the rear of the
module install only the (4) 10mm bolts in the
rear flanges prior to hoisting. Connect optional
lifting straps in a “X” pattern as shown and
hoist carefully.
Note: Depending on the battery type some
sagging may occur while lifting however once
releas ed and in pos ition will r eturn to squ ar e
(See Figure A9).
2. Battery Lift Table:
Again prior to ho isting, ins tall only the (4)
10mm bolts in the rear flanges. Verify module
orientation then position module on lift table
keeping metal surfaces isolated from battery
terminals. The mo dules flat top and bot tom
surfaces allow it to easily slide from the lift
platform to the base with little effort (See
Figure A10).
Note: When lifting battery modules always
verify t he lifting capacity of the equipment
being used and never lift m or e than one
module at a time.
3. Next, make only the lower tier module to base
connections using (8) 10mm bolts (4/side).
Torque to 40 ft-lb [55N*m].
Note: Only the Module to Base connection
requires the use of all (8) bolt connections
(See F ig ure A11).
Figure A10
Figure A11