User Manual

www.cbsscientific.com
3-D Flow Chamber Device Instructions April 2014
11
3.4. Filling the Reservoirs and Assembling the 3D Chamber.
a. If you are using 2 membranes as a sandwich ll the reservoir with ~800 ul of chemokine or buffer. If you are using
the single top membrane ll the chamber with ~1.5ml of chemokine or buffer.
b. Work quickly! If using the double membrane, rst pop the membranes together and then lay them into the reservoir.
If using a single membrane, lay it over the buffer using forceps. In either case, tamp the membranes down ush with
the top of the chamber and remove excess buffer if it overows from the reservoir using a pipet.