Manual
14
Cipher DGGE Instructions 2/28/14
DGGEK Unit Set-Up, con’t.
2.4 Setting Buffer Temperature
Warning: Do NOT turn on Heater/Stirrer until tank has been lled with buffer!
1. Turn Heater/Stirrer “On” and set temperature to 60°C according to
Section 2.3.4.f Setting the Set Point Temperature (page 11).
2.5 Connecting the Power Supply to Safety Interlock
2. Position EPS-300 X Power Supply on a shelf above the tank. Refer
to Figure 2-2 to complete the steps below:
a. Attach the power supply to the safety interlock.
b. Attach the safety interlock to a wall (mains) outlet.
c. Do NOT attach power leads (from power supply to safety
interlock) until gels are loaded and installed in the tank.