User guide

9
www.cbsscientic.com
4
5. Slide pre-cast gel cassette or plate set(s)
into the core assembly with the notched
plate facing in towards the upper buffer
reservoir as shown in gure 4. If using a
pre-cast gel stored at 4°C, allow to warm
to room temperature. If pouring your
own gels please see Alternate Protocol
(Section 4) on pages 12-14 describing
gel casting using Gel Wrap™.
6. If running one gel, slide white plastic
adaptor plate into the side without the
gel. If running a Lonza 10cm x 9cm gel
casssette place clear shim as shown in
gure 5.
7. Close doors and relatch by pressing
down on the white latches so that the
assembly looks like that shown in gure
6.
8. Place stirring bar into bottom of reservoir
in stirring corral (as shown in gure 7 on
page 10).
9. If using freezer blocks, take frozen
blocks out of freezer and insert into
receptacles on either side of lower res-
ervoir.
5
6