Installation Manual
NÜO PASS Manual
Installation NÜO PASS
8
Installation on concrete walls
1) Follow the initial steps listed in page 6.
2) Make 4 holes at the distance marked for Fis-
cher 5mm wall plugs.
3) Secure the mounting box using the 4 Fischer
wall plugs and the screws supplied.
130
70
4) Connect the wiring pipe and pass the cable
through, connecting the equipment.
5) Tighten the screws and place the front
panel.
Distance between holes 130 x 70mm
Mounting box: 42170
-- INSTALLATION ON CONCRETE WALLS: