Install Instructions
14
11. Upon inspection completion, lift door and place
integral cast hinge pins into door mounting bracket
slotted holes. Do not close and secure door at this
time, proceed to installing stainless steel ueway
bafes.
12. Locate/remove four #8 x ½” shoulder sheet metal
screws from Hardware Bag, then, install them into
front panel ange holes.
E. FLUEWAY BAFFLE INSTALLATION.
Flueway bafes are enclosed into Part Carton. Bafe
requirements differ by boiler model, see Table 2.
TABLE 2: BAFFLE USAGE
Figure 5C: Top View - Burner Swing Door Fully Closed but Not Properly Secured or Sealed
NOTE: Read caution statement before proceeding.
CAUTION
These bafes will generate higher efciencies
and lower stack temperatures. Under certain
conditions, a lower gross stack temperature
entering the chimney has the potential to
be cooled below the dew point and create
condensate on interior surfaces. Flue gas
condensate is corrosive, which requires
special consideration and must be addressed
immediately.
DO NOT install bafes until you have read
Section V, "Venting" completely.
1. To install ueway bafes, provided in miscellaneous
part cartons, as follows, refer to Figure 6 and
Table 2:
• Models MST396, MST513 and MST629 - To
install ueway bafe in 2
nd
pass ueway on
left side of boiler, hold bafe with word "Left"
readable at the top. Slide bafe in ueway until
position tab touches ns on right side of 2
nd
pass
ueway. To install ueway bafe in 2
nd
pass
Boiler
Model
Baffle Usage
2
nd
Pass 3
rd
Pass
MST288 None
MST396
(2)
P/N 100042-01
NoneMST513
MST629
SECTION II: UNIT-PAK BOILER ASSEMBLY (continued)