Install Instructions
10
EMP
Installation & Service Manual
109529-03 - 11/19
A.  REMOVE CRATE.
1.  Remove all fasteners at crate skid.
2.  Lift outside container and remove all other 
inside protective spacers and bracing. 
Remove miscellaneous parts carton.
B.  REMOVE BOILER FROM SKID.
1.  To reduce the risk of damage to boiler jacket, 
use the following procedure to remove from 
skid, see Figure 3:
Step 1. Boiler is secured to base with (4) 5/16” 
cap screws, (2) in front and (2) in rear of 
shipping skid, see Figure 3. Remove all 
securing hardware.
Step 2. Place wooden block(s) 12” from rear 
of skid as shown (one piece 4” x 4” x 16” lg. 
or two pieces of 2” x 4” x 16” lg.)
Step 3. Insert 1” Sch. 40 pipe handles through 
leg hole in front and rear legs. Center end 
of pipe on wooden blocks as shown in 
Figure 3.
  NOTE: Pipe handles should extend a 
minimum of 48” beyond jacket front panel 
for best leverage.
Step 4. Using the pipe handles, lift boiler until 
adjustable legs are elevated above the 
deck boards.
Step 5. Remove skid from underneath the 
boiler.
Step 6.  Lower pipe handles until front 
adjustable legs touch floor. If necessary, 
place wooden blocks under front legs 
before lowering to provide hand clearance.
Step 7. To lower rear of boiler, tilt unit slightly 
forward by pushing on smokebox collar or 
lift pipes protruding through rear legs until 
wooden blocks can be removed (see Figure 
3). Slowly allow the weight of the boiler to 
tilt backward until rear legs rest on floor.
Step 8. If wooden block was placed under 
front legs, lift pipe handles, remove wooden 
block and lower front legs to floor. Remove 
pipe handles.
CAUTION
 Do not drop boiler. Do not bump boiler jacket 
against floor.
C.  MOVE BOILER TO PERMANENT POSITION 
by sliding or walking.
D.  PROCEDURE TO OPEN, CLOSE AND 
SECURE BURNER SWING DOOR 
  Throughout this manual you will be instructed to 
open and close the burner swing door for various 
reasons. There is a proper and improper method 
to closing and securing the burner swing door 
opened for inspection, cleaning or field service.
Figure 3: Packaged Boiler Removal from Skid
2 Packaged Boiler Assembly - Trim
!