Installation Operating Instructions
8
BOILER SIZE
5006B 5007B 5008B 5009B 5010B 5011B 5012B 5013B 5014B 5015B 5016B 5017B 5018B 5019B 5020B 5021B 5022B 5024B 5026B
CARTONS, PACKAGES OR BUNDLES
7 S Steam Trim Carton (Steam Boilers Only - Includes PA404 Pressure Limit Control) 4 Sizes - One Per Boiler
1 1 1 1 --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- ---
2 --- --- --- 1 1 1 --- --- --- --- --- --- --- --- --- --- --- --- ---
3 --- --- --- --- --- --- 1 1 1 1 1 1 1 1 1 --- --- --- ---
4 --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- 1 1 1 1
67 BC-2 Low Water Cut-off Carton (Steam Boilers Only) One Per Boiler
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
7 W Water Trim Carton (Water Boilers Only - Includes L4006A Temp. Limit Control) 3 Sizes - One Per Boiler
2 1 1 1 1 1 1 --- --- --- --- --- --- --- --- --- --- --- --- ---
3 --- --- --- --- --- -- 1 1 1 1 1 1 1 1 1 1 1 1 1
4 --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- 1 1
64 Low Water Cut-off Carton (Water Boilers Only) One Per Boiler
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
U
8
Complete Jacket Carton Assembly - One Per Boiler
c
9
1
Gas Train Cartons (By Gas) 2 Sizes - One or Two Per Boiler
c
9
1
1 1 1 --- --- --- --- --- --- 2 1 --- --- --- --- --- --- --- ---
c
9
2
--- --- --- 1 1 1 1 1 1 --- 1 2 2 2 2 2 2 2 2
THERM. Controls Carton(s) (Manual Ignition. - 100% Shutoff - 24V.) 1 Size - One or Two Per Boiler
Natural 1 1 1 1 1 1 1 1 --- 2 2 2 2 2 2 2 2 2 ---
U
HCP
1
Plain Heater Cover Plate (Not furnished on Water Boiler Ordered With Two Tankless Heaters) One Per Boiler
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
U
HCP
2
Tapped (¾” NPT) Heater Cover Plate (Not Furnished on Water Boiler Ordered With Tankless Heater(s) One Per Boiler
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
CANADIAN
EQUIPMENT CHECK LIST
INSPECT SHIPMENT carefully for any signs of damage. All equipment is carefully manufactured, inspected and packed.
Our responsibility ceases upon delivery of Boiler to carrier in good condition. Any claims for damage or shortage in
shipment must be led immediately against the carrier by the consignee. No claims for variances or shortages will be
allowed by Boiler Manufacturer, unless presented within sixty (60) days after receipt of equipment.
SECTION I - EQUIPMENT CHECK LIST - Page 5
SECTION II - GENERAL INFORMATION - Page 10
SECTION III - INSTALLATION INSTRUCTIONS - Page 11
SECTION IV - OPERATION - Page 43
SECTION V - SERVICE - Page 64
SERVICE RECORDS - Pages 73, 110, 111
SECTION VI - REPAIR PARTS - Page 74
APPENDIX A - FIGURES - Page 105
APPENDIX B - TABLES - Page 108
SECTION I – EQUIPMENT CHECK LIST (continued)










