Installation Instructions

STEP 10 You are now ready to test your CONTRACTOR SUMP BUDDY. Try the automatic
control valve by lifting up the oat. Water will go through the CONTRACTOR
SUMP BUDDY. Push down the oat to shut off water ow.
STEP 11 Fill the sump pit with water. Verify the action of the automatic control valve and
the level of water to start your CONTRACTOR SUMP BUDDY, then repeat the
operation many times.
STEP 12 Turn on electrical power of the conventionnal sump pump and verify the entire
system.
TYPICAL INSTALLATION DIAGRAM
FOR THE CONTRACTOR SUMP BUDDY:
STEP 4
STEP 3
STEP 8 STEP 6-7
STEP 9
STEP 11
STEP 10
STEP 2
STEP 12
2’’ to 3’’
(5 to 8 cm)
STEP 5