Installation & Operation Guide

5
COFFEE GRINDING
1. On models LPG-2E, select (either left or right hopper) with selector switch and visually inspect the desired
hopper for an ample supply of whole bean coffee.
2. Place a paper filter into the brew funnel. The filter must not be folded-over or tilted to one side.
3. Insert the funnel into the funnel rails and push until it stops.
4. Momentarily press Off/On/Start switch to the “START” lower position and release. The grinding action will
stop automatically after the preset amount of ground coffee is dispensed into the funnel.
5. Remove the funnel from the grinder and level the bed of grounds by gently shaking.
6. The loaded funnel is now ready for use in any commercial drip coffee brewer according to the manufacturer’s
instructions.
STEP #1
STEP #2
STEP #3
STEP #4
STEP #5
27091 111598