INSTALLATION & OPERATING GUIDE

7
10. Press the seals firmly into
place.
9.
Install each hopper seal over
the flange at the rear of the
cooling drums as shown.
12. Thoroughly rinse the hoppers
and install them over the augers
and cooling drums.
16.
Set the lid(s) on the hopper(s).
Lift slightly and slide back or
front for filling.
17. Plug in the hopper lid lamp
cord(s).
18. Assemble the drip tray.
INITIAL SETUP (CONT.)
13. Slide the hopper(s) into place
and push down until the hop-
per lock plunger snaps into
place. For models without PAF,
proceed to step 15.
15. Install PAF unit onto platform
and plug power cord into rear
of platform. Plug platform power
cord into proper outlet. (Refer
to PAF manual for water con-
nections)(Proceed to step 18)
11.
Align the auger shaft with the
flat fin of the auger. Push the
augers as far as they will go
and rotate them so the flat fin
is facing up.
14. For models with PAF, install
level probes into slots at top
rear of PAF hoppers.
45246 072611
RELEASED FOR PRODUCTION
DIR Num: 45246.0000 12, June 2015