Manual

14
Sensor Docking Station
Post-Turbo
1. Choose the pyrometer location. It should be about 3
downstream from the turbocharger exhaust outlet. Try to be
within 1 of the 3 target.
2. Drill a
5
16
hole into the exhaust downpipe.
3. Use a
1
8
pipe tap to thread the hole.
4. Mount the pyrometer probe in the hole.
5. Use a
9
16
wrenchtotightenthetaperedendofthettingto
the exhaust downpipe.
6. Use a
5
8
wrench to tighten the top nut on the pyrometer to
thetting.
7. Run the pyrometer cable through the engine bay to the
place where it will be connected to the Sensor Docking
Station.
• Be sure to protect the cable from extreme heat or moving
parts.
• Use some of the included zip ties to keep the cable
secure inside the engine bay.
Tool Tips: For some vehicles, it will be impossible to reach
the turbo downpipe with a drill and a pipe tap. In these
situations, the downpipe may have to be removed. The
ideal time to install a post-turbo pyrometer is when a new
exhaust is being installed on the vehicle.