Instruction Manual
22
PMT INSTALLATION
Introduction Parts Description Operating Instructions Internet Updates Appendix
POSTTURBO MOUNT
1. Find a location on the exhaust pipe that is 3-6”
downstream from the turbo charger output. Then
drill a
5
/
16
” hole and run a
1
/
8
” pipe tap into the hole.
Mount the Pyrometer Probe in the threaded hole
using a
9
/
16
” wrench to tighten the probe holder or
tube tting to the down tube. Then tighten the
Pyro Probe Cap to the holder using a
5
/
8
” wrench.
2. Run the Pyro Cable along the brim of the engine
bay, and then let the end sit when installing the
PCH Board.
Dodge Post-turbo Mount
Securing pyro line
Pyro line secured
PMT Installation