User`s guide
User Guide
75
www.bull.com
Rack Installation Kit Assembly
This section provides the assembly instructions for mounting the server into a standard
19-inch rack cabinet.
Unpacking the Rack Installation Kit
Although the rack installation kit is inspected and carefully packaged at the factory,
damage may occur during shipping. Follow these steps for unpacking.
1. Visually inspect the shipping containers; notify your carrier immediately of any
damage.
2. Carefully remove the rack mounting hardware and verify the parts.
Note: The quantities noted below are subject to change
without notice.
2 sets of support rail assem-
blies (1 front and 1 rear part for
each)
Figure 16: Rail assembly front and rear parts
(right side shown)
6 (minimum) self-tapping
screws (TCB M5) for support
rails front and rear parts
assembling
Figure 17: Self-tapping screws
6 (minimum) washers, to be
used with the 6 self-tapping
screws ("Figure 17: Self-tap-
ping screws")
Figure 18: Washers for the self-tapping screws