User`s guide
Upgrading Your Server 9-53
IMPORTANT: Carefully remove the riser card taking care not to touch other components.
5. Remove the two screws securing the bracket, then remove the bracket.
Screws
6. Remove the PCI bracket from the RAID Controller.
Screws
PCI bracket
7. Install the RAID Controller to the bracket that has been removed from the server chassis.
Use the screws that were used for securing the PCI bracket.