User`s guide
3-16
User's Guide
- If the required domain configuration scheme is already loaded, the corresponding
domain(s) are available for domain management. Go to Step 2.
- If a scheme has not been previously loaded, you are invited to select and load a
scheme. See Viewing a Domain Configuration Scheme, on page 3-6 and Loading a
Domain Configuration Scheme, on page 3-8.
- If a Scheme is already loaded, but is not the required Scheme, see Adding Domains to
the current Domain Configuration and Replacing the current Domain Configuration, on
page 3-10.
2. Click Multiple Power. The Multiple Power Domains On/Off dialog opens.
Deselect All Cancels all selected operations.
Power On All Powers on all INACTIVE domains.
Power Off All Powers off all RUNNING domains.
Force Power Off All Forcibly powers off all RUNNING or HUNG domains.
Deselect Cancels the selected operation for this domain.
Power On Powers on this domain if INACTIVE.
Power Off Powers off this domain if RUNNING.
Force Power Off Forcibly powers of this domain if RUNNING or HUNG.
Execute Applies all selected operations.
Cancel Cancels all selected operations.
Figure 42. Multiple power dialog - quadri-domain example
3. Click Power On All -> Execute or select the required domain Power On radio buttons and
click Execute to simultaneously power on the selected INACTIVE domains and associated
hardware components.
Domain hardware is powered up from the stand-by mode to the main mode and the
Operating System is booted. As the power-on sequence progresses, power-on steps and
domain state are displayed in the Domain Status panel, as shown in the following table.
Power On States
POWERING ON