User`s guide
2-10
User's Guide
Powering Up / Down Server Domains
To power up / down the server, see:
• Powering Up / Down the NovaScale 5xx5 Partitioned Server Domains, on page 2-12
Powering Up the NovaScale 5xx5 SMP Server Domain
NovaScale 5xx5 SMP Servers are designed to operate as single SMP systems and are
delivered with one pre-configured domain.
When server status has been checked - functional status icon and CSS availability status bar
green in the Status pane - the server domain can be powered up.
Note:
If an error dialog box appears during this sequence, see Chapter 3. Managing Domains.
To power up server domains:
4. From the PAM Tree, click Domain Manager to open the Control pane. A dialog box
invites you to load the server domain.
5. Click OK to confirm. The domain appears in the Control pane. If the domain is ready to
be powered up, INACTIVE is displayed in the Domain State box and the Power On button
is accessible.
6. Select the domain and click Power On to power up the server domain and associated
hardware components.
1 Functional status icon
2 CSS availability status indicator (GREEN)
3 Operating system type
Figure 30. Domain Manager Control pane