User`s guide
5-126
User's Guide
Scheme, Domain Identity, and Resources Checklists
Scheme Checklist
Name
What name do I want to use for my Scheme?
Description
How can I describe my Scheme to reflect its scope?
Central Subsystem(s)
Which Central Subsystem(s) do I want to use?
Number of Domains
How many domains do I need?
Domain Size
How many cells do I want to assign to each domain?
EFI Boot LUNs
Which EFI boot LUN do I want to use for each domain?
Data LUNs *
Which data LUNs do I want to assign to each domain?
Fibre Channel Hosts *
Which fibre channel host(s) do I want to use to access
LUNs?
I/O Resource Location
Which cells host the I/O resources I want to use?
Resource Access
Do I want to limit access to certain hardware resources?
* Reserved for systems connected to a Storage Area Network (SAN).
Table 53. Scheme configuration checklist