User`s guide
5-83
Tips and Features for Administrators
Creating a Mono-Domain Scheme Using a Selection of Server
Resources
Notes:
• A domain configuration scheme can include more than one Central Subsystems. If you
have more than one Bull NovaScale Server, see Configuring and Managing Extended
Systems, on page 5-125.
• For more information about scheme and identity configuration options, refer to:
- Assessing Configuration Requirements, on page 5-31
- Creating a Domain Configuration Scheme, on page 5-33
- Creating a Domain Identity, on page 5-50
The configuration criteria set out in the following tables is used to illustrate this example:
NovaScale 5085 Partitioned Server
Scheme
Name MyOffpeakProdScheme
Description Mono-domain, Cell 1, MyOffpeakProd
Central Subsystem(s) MYSERVER-00
Number of domains 1
Domain size 1 cell: Cell 1
EFI boot LUNs SAN: FDA1300 LUN1
Data LUNs (SAN only) SAN: FDA 1300 LUN10, LUN6
Fibre channel hosts (SAN only) Primary Link: Cell_1: Module_0/IOC_1/PCISLOT_1
IO resource location 0IOC1
Resource access All resources unlocked
Domain Identity
Name MyOffpeakProd
Description Time zone: Paris
Operating System Linux
Domain network name MyOffpeakProdNet
Domain IP address 124.124.1.0
Domain URL http://www.MyOffpeakProdWeb.com
Domain CPU parameters Monothreading mode
High memory IO space Disabled
IO memory space optimization Disabled
Licensing number XAN-S11-99999/12
Substitute mode Enabled
Halt on machine check reset Disabled
Table 42. Scheme configuration criteria - example 2 - mono-module server