User`s guide
5-44
User's Guide
20.Click Add. The selected Data LUN is moved to the Data LUNs selected list.
Figure 111.Select Data LUN dialog - Data luns selected list
21.Repeat Steps 19 and 20 for each Data LUN you want to add to the domain and click OK
to return to the Scheme Management dialog. Data LUN set is now displayed in the Data
LUNs field.
The Status icon remains red and the No Link icon
is displayed. You must now link the
selected EFI and Data LUNs to the Fibre Channel Host you want to use to access these
LUNs.
22.Click Domains -> Link to open the Link LUNs to HBA dialog.
Figure 112.Link LUNs to HBA dialog