Installation guide
2-47
Setup Procedure
Renaming a Central Subsystem
Note:
Central Subsystem configuration is reserved for Customer Service Engineers.
The Central Subsystem may be renamed to suit Customer requirements. Changes to Central
Subsystem configuration entail removing the existing Central Subsystem from the
configuration and adding a new Central Subsystem to the configuration with the name
chosen by the Customer.
Removing / Adding a Central Subsystem
1. From the Support Administrator PAM Tree, click Domain Manager to check that all
domains are INACTIVE. If a domain is ACTIVE, request the Customer to power down the
domain. See Powering Up / Down Server Domains, on page 2-16.
2. Click Configuration Tasks → Central Subsystem. The Central Subsystem control pane
opens.
3. Select the Central Subsystem and click Remove. A dialog opens requesting you to confirm
removal.
4. Click OK to remove the Central Subsystem.
5. Click New. The Add Central Subsystem dialog appears.
Figure 49. Central Subsystem control pane
6. Enter the Central Subsystem name supplied by the Customer and the hardware
hexadecimal identifier (between 0 and F as indicated on the PMB CSS code wheel).
Note:
Up to 16 CSS modules can be linked, via a PMB to the PAP unit. PMB code wheels allow
the identification of each cabinet and each CSS module in the Customer's configuration.
Note:
The Central Subsystem name is forced to uppercase characters by the system for
compatibility reasons.