Installation guide
1-8
Installation Guide
Unpacking the Server Cabinet
Instructions on how to unpack cabinets for Bull NovaScale Servers and peripheral devices
are set out in document Bull 1300H/L & 1100H/L Cabinets, 86 A1 91EM.
Warning:
The server must not be unpacked before it has reached room temperature (24 hours in the
Computer Room).
DANGER
Server cabinets are extremely heavy. Authorized Service personnel ONLY may unpack and
physically install cabinets. The instructions set out below are to be strictly complied with to
avoid serious personal injury.
Inspecting the Server before Unloading the Cabinet
Once the server cabinet has been unpacked, you must perform a preliminary visual
inspection before unloading the cabinet.
Note:
Server components and configuration may differ according to the version chosen.
CAUTION:
If the inspection indicates an unacceptable safety condition, the condition must be corrected
before powering up the server.
1. Check that the server delivered is compliant with the Purchase Order.
2. Check covers and doors for sharp edges, damage or alterations.
3. Check the correct fit of covers and doors.
4. Open the front and rear doors.
Note:
Unlock the front door with the key, pull the handle forwards and upwards to disengage the
lock.
5. Check for internal damage, alterations and obvious safety hazards such as broken wires,
sharp edges, or broken insulation.
6. Check internal cables for damage.
7. Check for dirt, water, and any other form of contamination inside the cabinet.
8. Check the voltage label on the back of the cabinet to ensure that it matches the voltage at
the power outlet.
9. Check external power cables for damage.
10.Check correct closure of front and rear doors.