Installation guide

2-53
Setup Procedure
7. Reboot the PAP Unit by pressing the Power On switch (A) in the above figure.
8. Wait for Windows ready and launch Adaptec Storage Manager.
9. Insert the blank (third) disk and monitor the building process.
Figure 55. Blank disk building process