Installation guide

2-19
Setup Procedure
Powering Up / Down the Server Domain
The Bull NovaScale 5000 Series server is designed to operate as a single SMP system and
is delivered with one pre–configured domain.
When server status has been checked – functional status icon and CSS availability status
bar green in the Status pane – the server domain can be powered up.
Powering Up the Domain
1. From the PAM Tree, click Domain Manager to open the Control pane. If the server
domain is in the stand–by mode, INACTIVE is displayed in the Domain Status panel
and the Power ON button is accessible.
2. Click Power ON to power up the server domain and associated hardware components.
Functional status icon &
CSS availability status indicator
GREEN
Power ON step and state indicators
Domain Status panel
Figure 51. Domain Manager Control pane
3. Toggle the local / integrated console from the PAP unit display to the server display. See
Toggling the Local / Integrated Console Display, on page 2-18.
Note:
For further details about the Power ON sequence, see Powering ON a Domain in the User’s
Guide, 86 A1 89EF.
Note:
If the functional status icon and/or presence status bar is/are not green or if the domain
cannot be powered up, see Chapter 3. Troubleshooting.