Installation guide
2-3
Setup Procedure
Checking Server Cabling
Important:
Cables to external peripherals must NOT be connected before powering up the server
for the first time.
These cables must only be connected once server operation has been checked.
All internal cabinet cables are pre–connected before shipping. However, cables may
become loose during shipping and you are advised to check for loose cables before
powering up the server.
See Appendix C. NovaScale 5080/5160 Server Cabling.