Specifications
Chapter 3 Mechanical and Electrical InstallationVFD‐G7 Series Frequency Inverter
Operation Manual
25
SingleInstallationUpperandlowerInstallation
☞Note: When the frequency inverter
power is less than 22KW, size “A” could
not be considered to install, on the
contrary, size “A” should be longer than
50mm.
☞Note: When two frequenccy inverters
are mounted one on top the other, an
heat insulation
guide plate should be
fixedinbetweenasshowninaboveFig
Fig.3‐1VFD‐G7FrequencyInverterInstallation
When installing, the thermal dissipation should be paid attention to. so please note the
followin
g:
1)In ordertoeasy todissipatethethermal,pleaseinstall theinverter vertically.But can
notbeinverted.Ifthereareseveralinvertersin thecabinet,the bestmethod istoinstal
sidebyside.WhentwoVariableSpeedDrivesareinstalledoneontoptheother,theheat
insulation
guideplateshouldbeinstalledbetweenasshowninFig.3‐1.
2)The requirementsoninstallationspaceareshown inFig. 3‐1whichshouldensurethe
heat dissipation space of the frequency inverter. Layout should ensure the heat
dissipationconditionofothercomponentsinthecabinet.
3)Mounting
bracketmustbeflame‐retardantmaterial.
4)Forthelocationwherethereismetalpowder,theinvertershouldbemountedoutside
of the cabinet. If the space is sealed, should make the cabinet having space as large as
possible.
3.1.3 Cover Removing Way