Instruction Manual

STEP 5 : After all connections have been securely made, re-connect the load to the terminal
by connecting the load’s phase 1 wire to terminal T1; the load’s phase 2 wire to terminal T2;
the load’s phase 3 wire to terminal T3 and the load’s neutral wire to terminal TN. Make sure
all connections are tightly secured. The final setup should look like this (please refer to the
diagram 5 and diagram 6 below) :
Diagram 5
Diagram 6