Instruction Manual
STEP 2 : After identifying the terminal, switch off the load connected to that terminal. Also,
as a precaution, switch off the mains supply entering into that terminal. Please use a tester
screwdriver to ensure there’s no current flowing through the terminal. Next, carefully remove
the load wires from the terminal - remove only those wires that are directly connected to the
load you wish to monitor, ie. phase 1, phase 2, phase 3 and neutral wire going into the load.
Please refer to the diagram below :
Diagram 2