Instruction Manual
Installation Instructions :
a. Hardware installation :
STEP 1
to the Mains Supply. The phase wires (phase 1, phase 2, and phase 3) and the neutral wire
must be connected to this terminal. These connection points are represented as T1, T2, T3
and TN in the diagram below. Place the 3-Phase IoT Energy Meter close to this terminal.
Diagram 1
This document outlines the steps involved in installing the Smart Energy Meter/Analyzer
for 3 phase (star type) load systems. For 1-phase, 2-phase and 3-phase delta loads, the
installation process stays the same. Contact info@buildingpulse.org for more info.
: Identify the 3 Phase load you’d like to monitor, along with the terminal connecting it