Installation Guide

2
DRYWALL
• Hammer Drywall anchor
Nailset Construction adhesive (i.e. liquid nails)
Electric drill Wood ller
Drill bits Level
Phillips head bit Stud nder
6d 2” nish nails Mounting board
Drywall screws (at least 3-1/2” long)
MASONRY / BRICK
• Hammer Masonry screws (at least 2-1/2”’; for brick)
Nailset Construction adhesive (i.e. Liquid Nails)
Electric drill Wood ller
Drill bits Level
Phillips head bit Mounting board
6d 2” nish nails
READ ALL INSTRUCTIONS AND REVIEW DIAGRAMS
BEFORE BEGINNING THE INSTALLATION TO GET A
THOROUGH UNDERSTANDING OF THE PROCESS.
SAFETY NOTICES
Always practice safety and use appropriate eye and ear protection when using power tools.
Do not put heavy weight on mantel (over 20 pounds is not recommended). Do not let children
climb on or pull on the mantel. Check local re code and instruction from manufacturer of the
replace insert or stove for proper clearance between any wood mantel surface and rebox
opening (typically 12”). OrePac Building Products
®
cannot be held responsible for the incorrect
installation of the mantel shelf and/or leg/skirt kit.
MATERIALS REQUIRED