Operator`s manual
20
\
11. Replace the four o-rings, 1, and three shims, 2,
located on the blue valve section. Make certain
that the new o-rings are properly seated in the
grooves.
10000648
1
2
2
1
47
12. Installthethree-pointhitchvalveslice,1,ontothe
through bolts. Install new o-rings, 2, and shims,
3, to the outside of the three-point hitch valve
slice. Make certain that the o-rings are seated
properly in the grooves.
10000649
3
1
2
3
2
48
13. Install the end cap, 1, onto the implement valve
assembly. Install a lock washer and nut on each
through bolt, 2. Torque the hardware to 29 N⋅m
(22 ft. lbs.).
NOTE: If the tractor being worked on is an 80 Series
non HydraFlow tractor install the end cap that is
contained in this kit. If the tractor being worked on is
an80series HydraFlow,82Series, 84series or2000
Series the end cap contained in the kit will not be
used. Reinstall the original end cap removed in step
#10.
IMPORTANT: Torque the nuts to a maximum of 29
N⋅m (22 ft. lbs.). Do not over tighten the nuts as this
will cause the valve spools to bind.
10000650
1
2
49










