Technical data

5
Installation
SU54/5, SU80/5, SU100/5 – 6 720 808 532 (2013/08) 9
5.1.2 Wall clearances
Fig. 6 Recommended minimum wall clearances
5.1.3 Positioning the tank
Unpack the tank by removing the wrap, wooden boards and foam pad
on the top.
Lay the foam pad on the floor to serve as a mat.
Fig. 7 Unpacking the DHW tank
Carefully place the DHW tank on the cover pad [1].
Cut out the raised sections in the EPS bottom pad [2].
Unscrew the screw-in feet [3].
Fig. 8 Laying the DH tank on its side and exposing the adjustable feet
Position the DHW tank on a level floor with adequate load-bearing
capacity.
Fig. 9 Positioning the tank
Maintain minimum wall clearances.
Using the adjustable feet, align the DHW tank vertically.
6 720 801 769-03.1ITL
6 720 800 035-04.1ITL
6 720 801 769-15.1ITL
1.
2.
3.