Installation Instructions

SSB 6720818454 (2016/02) US
Commissioning log for the appliance | 55
Modied service functions: (select the modied service functions and enter the values here).
Example: Vent Length Parameter changed from 1 to 2
Heating control 850 MIN:
Vent length setting (par.99 “Flue length range”) 1 | 2 | 3 | 4
Gas type setting (par 98 “Gas Type”) NG | LPG
CH set point (par. 3) : DHW set point (par. 48) :
Other:
Heating control programmed, notes:
Documented the modied setting of the heating control in the control operating/ installation instructions
The following work has been carried out:
Electrical connections checked, notes:
Condensate trap lled Carry out a combustion air/ue gas test
Function check carried out Tightness test carried out on the gas and water sides
Commissioning includes checking the setting, a visual heating leak test and a functional check oh the boiler and control. The system installer conducts a
test of the heating system.
This system has been checked to the extent described. The documents have been handed over to the home owner/operator. The
home owner/operator has been instructed regarding safety and operation
of the boiler and accessories, including the need for regular scheduled
maintenance.
Name of service installing contractor Date, owner/operator signature
Afx the test report here.
Date, system installer’s signature