Installation Instructions
SSB 6720818454 (2016/02) US
Commissioning log for the appliance | 55
Modied service functions: (select the modied service functions and enter the values here).
Example: Vent Length Parameter changed from 1 to 2
Heating control 850 MIN:
Vent length setting (par.99 “Flue length range”) � 1 | � 2 | � 3 | � 4
Gas type setting (par 98 “Gas Type”) � NG | � LPG
CH set point (par. 3) : DHW set point (par. 48) :
Other:
� Heating control programmed, notes:
� Documented the modied setting of the heating control in the control operating/ installation instructions
The following work has been carried out:
� Electrical connections checked, notes:
� Condensate trap lled � Carry out a combustion air/ue gas test
� Function check carried out � Tightness test carried out on the gas and water sides
Commissioning includes checking the setting, a visual heating leak test and a functional check oh the boiler and control. The system installer conducts a
test of the heating system.
This system has been checked to the extent described. The documents have been handed over to the home owner/operator. The
home owner/operator has been instructed regarding safety and operation
of the boiler and accessories, including the need for regular scheduled
maintenance.
Name of service installing contractor Date, owner/operator signature
Afx the test report here.
Date, system installer’s signature










