Installation Instructions

13
System inspection and maintenance
Logano G615 - Subject to technical modifications
54
Additional maintenance work as-needed Page Date:____________ Date:____________
1. Shut down the heating system
Æ
46
2. Remove and clean heat exchanger baffles
Æ
48
3. Clean the flue gas passages (heating surfaces) and flue
gas baffles
Æ
48
4. Clean the combustion chamber
Æ
48
5. Clean the draft diverter
Æ
48
6. Insert the flue gas baffles
Æ
29
7. Check gaskets/sealant ropes on the burner and burner
door and replace if required
Æ
48
8. Commissioning the heating system
Æ
43
9. Record the final checks of the maintenance work, incl.
measurements and test results
10. Check safe and proper operation
Confirm professional inspection
Company stamp/
signature
Company stamp/
signature
Tab. 17 Maintenance log book