Installation Instructions
7
Boiler block assembly
Logano G615 - Subject to technical modifications
20
Fig. 11 Driving nipples home
B Coat the packing grooves with adhesive (primer).
Fig. 12 Coat the packing grooves with adhesive
(primer)
1 Packing grooves
B Insert the flexible sealant rope on the front of the rear
section, starting around the top hub, into the packing
grooves, and press in lightly.
B At the butt joints, overlap the sealant rope by approx.
3/4" (20 mm) and press firmly together.
B Do not let sealant rope overlap at the left and right of
the butt joints (Æ Fig. 13, [3]).
Fig. 13 Inserting sealant rope
1 Packing grooves
2 Sealant rope
3 Butt joints
Prepare the first intermediate section (with top
supply connection):
B File down any burrs on the hub.
B The packing springs must be clean and dry. Clean if
necessary.
B Clean the hub sealing faces with a rag soaked in
mineral spirit or gasoline.
Fig. 14 Preparing the center section
1 Sealing face of the hub
2 Packing springs
Unroll the required length of sealant rope
from the spool supplied. Peel the backing
paper from the sealant rope when inserting
into the packing groove (do not stretch).
1-1/4"
(32 mm)
1-3/4" (43 mm)










