Installation Instructions
13
System inspection and maintenance
Logano G515 – 6 720 647 208 (2014/09)44
Additional maintenance work as-needed Page Date:____________ Date:____________
1. Shut down the heating system 38
2. Remove and clean heat exchanger baffles 39
3. Clean the flue gas passages (heating surfaces) and flue gas baffles 40
4. Clean the combustion chamber 40
5. Clean the draft diverter 40
6. Insert the flue gas baffles 40
7. Check gaskets/sealant ropes on the burner and burner door and replace if
required (see burner documentation)
8. Commissioning the heating system 35
9. Record the final checks of the maintenance work, incl. measurements and
test results
10. Check safe and proper operation
Confirm professional inspection
Company stamp/signature Company stamp/signature
Date:____________ Date:____________ Date:____________ Date:____________
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Company stamp/signature Company stamp/signature Company stamp/signature Company stamp/signature










