Installation Instructions

7
Boiler block assembly
Logano G515 – 6 720 647 208 (2014/09) 29
Push the center boiler cover with the folded edges ( Fig. 53, [1])
under the front boiler cover and insert into the bead of the side
panels.
Fig. 53 Fitting the center cover
Fit the rear boiler cover on the side panels with the folded edges and
cut-out for the heating circuit flow ( Fig. 54, [1]) facing toward the
front.
Fig. 54 Fitting the rear cover
Push upper rear boiler panel under the rear boiler cover ( Fig. 55,
[1]) and screw to the side panels from the back using four self-
tapping screws ( Fig. 55, [2]).
Fig. 55 Fitting the rear boiler panel
Insert snap nuts into the left and right-hand side panels and also the
rear boiler panel sections ( Fig. 56, [1, 3, 4, and 8]).
Hang the bottom rear boiler panel sections on the left and right into
the slots in the folded edge of the upper rear boiler panel and the side
panel ( Fig. 56, [5]).
Secure the rear panel sections of the boiler to the side panels with
self-tapping screws.
Screw the connecting plate ( Fig. 56, [2]) below the flue outlet to
the rear boiler panel sections using self-tapping screws.
Fasten the plastic cable entries to the left or right-hand side of the
upper rear boiler panel ( Fig. 56, [6 and 7]).
Fig. 56 Installing the rear boiler panel sections