Installation Instructions

7
Boiler block assembly
Logano G515 – 6 720 647 208 (2014/09)26
Fit rectangular thermal insulation ( Fig. 44. [1]) with the cut-outs
facing upwards at the front above the door.
Fasten thermal insulation to the block thermal insulation with the 3
spring hooks ( Fig. 44, [2]).
Fig. 44 Installing thermal insulation at the front
Push longitudinal rails ( Fig. 45, [1 and 2]) with pre-fitted screws
into the notches in the brackets, as previously described, and screw
together.
Fig. 45 Installing the longitudinal rails
Push back rear section thermal insulation ( Fig. 46, [1]) onto the
flue outlet. The cut-out for the boiler return ( Fig. 46, [2]) must
point upwards.
Attach the thermal insulation for the rear section via the four spring
hooks to the boiler block thermal insulation.
Close the slot below the flue outlet with a spring hook
( Fig. 46, [3]).
Fig. 46 Fitting the thermal insulation for the rear section
Hook each base rail ( Fig. 47, [1 and 3]) with the long projection
facing toward the front ( Fig. 47, [2]) into the bottom crosswise
profile rails.
Initially screw the side of the base rails loosely to the crosswise
profile rails using self-tapping screws.
Fig. 47 Mounting the side base rails
3112