Installation Instructions

7
Boiler block assembly
Logano G515 – 6 720 647 208 (2014/09)22
7.8.5 Insert the flue gas baffle plates
Take flue gas baffles out of the fittings case and insert into the flue gas
passages as indicated by the inscription on them ( Fig. 34 and
Tab. 11).
Fig. 34 Heat exchanger baffle plates
[1] Flue gas baffle plates (bottom right)
[2] Flue gas baffle plates (bottom left)
[3] Flue gas baffle plates (top left)
[4] Flue gas baffle plates (top right)
7.9 Installation of the boiler jacket
This section describes how to install thermal insulation and jacket
components.
Fig. 35 View from above: boiler block (7 boiler sections) with brackets
7.9.1 Mount the brackets
Loosely screw the brackets for the boiler jacket onto the upper ribs of
the boiler sections on the left and right ( Fig. 35, Fig. 36 and
Tab. 12).
Fig. 36 Installing the mounting brackets
In pre-assembled boilers, the flue gas baffles are already
fitted.
Remove the cardboard transport protectors from the
pre-assembled boiler.
Boiler
capacity
Number of
boiler
sections
Length of flue gas
baffle plate in
inches (mm)
Installation
information on the flue
gas baffle plate
( Fig. 34)
240 7 26 – 25/32 (680) top right
top left
bottom right
bottom left
295 8
350 9
400 10
455 11 16 – 47/64 (425) top right
top left
bottom right
bottom left
510 12
Table 11
You must install the cross rails and longitudinal rails
before installing the thermal insulation in order to be
able to align the brackets correctly.
To install the thermal insulation, you need to take the
longitudinal rails off again in the following step.
Screw the brackets on the rear section ( Fig. 36,
[2]) to the ribs from behind.
Screw the brackets of the front and intermediate
sections ( Fig. 36, [1]) on from the front only.